Catalog counts reflect Peak's tracked records. They do not guarantee that every program has final source-verified deadline or penalty detail.
Deadline Watch turns rule changes into owner action steps.
A concise publication-style view of important building energy deadlines, program changes, open questions, and practical actions for commercial owners and property teams.
Use this page to spot important changes, then confirm official sources before filing, budgeting, or advising an owner.
Deadline Watch connects rule changes to records, tasks, and decision points.
When a deadline may affect a real asset, check the building before assuming scope.
Most important changes in this edition.
This edition highlights Colorado program changes reflected in local program profiles. Use the linked official pages, rules, technical guidance, and ordinance materials before quoting requirements, deadlines, exemptions, or penalties for a specific building.
Energize Denver small buildings
Denver's current small-building materials show a size-based compliance ladder for 5,000-24,999 sq ft buildings, with dates running from December 31, 2026 through December 31, 2029. Denver also has proposed rule activity in 2026, so confirm the latest city guidance before owner-specific advice.
Lakewood, Colorado - new Energy Benchmarking Ordinance
Lakewood adopted a mandatory energy benchmarking ordinance for commercial, multifamily, public, and manufacturing buildings 10,000+ SF. The first report covers 2025 energy use and is due December 31, 2026.
Fine and sale-disclosure risk
Denver source materials describe penalty exposure for missed small-building compliance, partial compliance, renewable shortfalls, inaccurate data, withholding information, and sale-disclosure issues. Treat penalty amounts as source-check items before legal or owner-specific advice.
Simpler small-building pathways
Small buildings still generally comply through one qualifying path, most often lighting or renewable energy. Current materials also point to simplified instructions, timeline-extension documentation, and alternate options.
Dated items from the next 36 months of local program profiles.
Use this as the practical 30/60/90-plus view. Exact dated items are grouped by month and year. Program records without exact dates stay in the watchlist below until they are verified.
Includes benchmarking/reporting, data verification, audit/RCx/tune-up, exemption/extension, fee/payment, disclosure, and performance-plan milestones when exact dates are available.
Track programs that may need source confirmation.
The catalog keeps tracked programs visible, including records that still need exact deadline confirmation before they can appear in the dated timeline.
Open the official-source brief before acting on a specific program.
Use these briefs to confirm thresholds, dates, penalties, documents, and remaining uncertainty before turning a public update into building-specific advice.
Denver Small Buildings
5,000-24,999 SF Energize Denver pathway program with source-checked deadline, penalty, disclosure, and simplified-pathway notes.
Lakewood Energy Benchmarking
New 10,000+ SF Colorado benchmarking program with a December 31, 2026 first reporting deadline.
Colorado Building Performance
Statewide BPC, Energize Denver, Boulder BPO, Fort Collins BEWS, and Lakewood benchmarking in one practical Colorado brief.
Washington State CBPS
Large-building BPS program with planning needs around documentation, energy management, and compliance pathways.
Want this translated for your buildings?
Use Deadline Watch for orientation. Request an advisory review when a real building or portfolio needs coverage, deadlines, data gaps, and next actions in one place.